Location: Glenrock, Wyoming
Industry: Energy
The overhaul outage project for the PacifiCorp Dave Johnston Power Plant’s Unit 3 and 4 boiler burners encompassed the bottom ash, drag chain conveyors, boiler refractory, high energy piping, air preheaters, and steam turbine systems. CD Specialty Contractors provided scaffolding and a suspended swing stage, installed insulation, and performed asbestos abatement where required. This project was completed on May 12, 2017, with complete safety throughout all procedures.